
Atellica® CI Analyzer with Rack Handler Shut Down and Startup Job Aid
This job aid describes how to shut down and startup the Atellica® CI Analyzer with Rack Handler.
Atellica® CI Analyzer with Rack Handler SIEMENS Shut Down and Startup Job Aid Healthineers Restarting the PCC 4 The Process Center Computer (PCC) performs the main software tasks for the system, including the operator interface. 8 DL-C11 LabManager Examples of when this type of restart may be needed include: Samples LabManager • “Not Connected to PCC” error message Inproce George Washington • Maintenance activities not running Approximate time: 30 - 35 minutes Help Procedure: About 1. Ensure the modules are in Standby, Stopped, or Off state 2. Check to make sure the system is not currently exporting or printing 5 Sign Out 3. Check the Worklist screen to ensure there are no control-bracketed test results pending release AF030673 AF030676 with a closing bracket (Waiting For Bracket) 11:13 AM 10:41 AM 4. Select NOTE: If the software freezes, the PCC fails to restart or the 5. Select keyboard is not responding, wait 2-minutes and then: 6. Confirm by selecting again, then Yes • Select CTRL+ALT+DEL, then select from lower right 7. At the window for Sign In, select Restart corner of screen • Select Restart > Yes 8. Adhere to the caution message and then select Restart: “To prevent loss of data, ensure sample processing and maintenance activities are complete before attempting a Restart” • Proceed with log in at prompt Template Effective Date: 10 Aug 2021 | HILS 2223 1 Effective Date: 17-APR-2024 | QR700007057 Unrestricted I Published by Siemens Healthineers AG | © Siemens Healthineers AG, 2024 Atellica® CI Analyzer with Rack Handler SIEMENS Shut Down and Startup Job Aid Healthineers Shutting Down the Atellica CI Analyzer with Rack Handler This is the procedure for a full shut down of the system. Only complete a full shut down when the system requires it for troubleshooting, or when recommended by the Remote Service Center. In some cases, a faster procedure, such as a PCC restart, might be appropriate. Approximate Time: 2-10 minutes Procedure: SIEMENS ... Healthineers Atellica Solution 8 DL-CI LabManager 1 LabManager In the area for System Status, select the CI module A 1. George Washington CI-01 2. If the system is currently processing samples, select the stop icon System RH Ready Connected to PCC Help About To cancel all samples in process, select Stop Immediately Current Status 3 Tools • Sign Out B Front Covers Back Covers Patient Sample Processing G • To stop after completing all samples in process, select Stop Left Cover Locked Right Cover Locked Left Cover Closed Right Cover Closed 2 3. To power off the software and hardware, select > Yes Request Access 4. If appropriate, select the Rack Handler module then select > Yes Sign out of the system: NOTE: If the system is planned to be powered off for more than 30 minutes, 5. remove IM reagents from the system. Be sure to manually mix IM reagents A. Select in the Access bar at the top of the screen before reloading. B. Select and then select again If the system is planned to be powered off for more than 2 hours, remove CH and IM reagents from the system. C. In Sign Out, select Yes When reagents are off the system, store according to the assay IFU. 2 This topic is continued on the next slide. Effective Date: 17-APR-2024 | QR700007057 Unrestricted I Published by Siemens Healthineers AG | © Siemens Healthineers AG, 2024 Atellica® CI Analyzer with Rack Handler SIEMENS Shut Down and Startup Job Aid Healthineers Shutting Down the Atellica CI Analyzer with Rack Handler 6. Select Shutdown > Yes 7. When the primary user interface no longer displays, power off the system 8. Wait 30 seconds before restarting the system Atellica" Solution Operator ID* LabManager 7 Password * ............... D -D Password Help 6 Forgot Password ? Restart Shutdown Login Refer to the next slide for restart procedure. 3 Effective Date: 17-APR-2024 | QR700007057 Unrestricted I Published by Siemens Healthineers AG | © Siemens Healthineers AG, 2024 Atellica® CI Analyzer with Rack Handler SIEMENS Shut Down and Startup Job Aid Healthineers Starting the Atellica CI Analyzer with Rack Handler Approximate time: 45-60 minutes Procedure: 1. If appropriate, remove any obstructions from the Rack Handler entry queue and exit queue 2. Check the power switch. If the switch is in the down position, turn the power on by flipping up the switch 3. Sign into the system: 2 A. At the window for Sign In, enter the Operator ID and Password B. Select Sign In TO - 4. If the system does not start or any problems occur, contact the local o technical support provider Atellica" Solution Operator ID* LabManager A Password* Password Help Forgot Password ? Restart Shutdown Login 4 B Effective Date: 17-APR-2024 | QR700007057 Unrestricted I Published by Siemens Healthineers AG | © Siemens Healthineers AG, 2024 SIEMENS Healthineers Please note this learning material is for training purposes only. For the proper use of the software or hardware, please always use the Operator Manual or Instructions for Use (hereinafter collectively “Operator Manual”) issued by Siemens Healthineers. This material is to be used as training material only and shall by no means substitute the Operator Manual. Any material used in this training will not be updated on a regular basis and does not necessarily reflect the latest version of the software and hardware available at the time of the training. The Operator Manual shall be used as your main reference, in particular for relevant safety information like warnings and cautions. Please note: Some functions shown in this material are optional and might not be part of your system. Certain products, product related claims or functionalities (hereinafter collectively “Functionality”) may not (yet) be commercially available in your country. Due to regulatory requirements, the future availability of said Functionalities in any specific country is not guaranteed. Please contact your local Siemens Healthineers sales representative for the most current information. The reproduction, transmission or distribution of this training or its contents is not permitted without express written authority. Offenders will be liable for damages. All names and data of patients, parameters and configuration dependent designations are fictional and examples only. All rights, including rights created by patent grant or registration of a utility model or design, are reserved. Siemens Healthineers HQ I Siemens Healthineers AG Siemensstr. 3 91301 Forchheim Germany Phone: +49 9191 18-0 siemens-healthineers.com 5 Effective Date: 17-APR-2024 | QR700007057 Unrestricted I Published by Siemens Healthineers AG | © Siemens Healthineers AG, 2024
- atelica
- attellica
- attelica