
Replacing the Source Lamp on the Dimension® Family of Integrated Chemistry Systems Video
The source lamp on the Dimension® Family of Integrated Chemistry Systems is a customer replaceable part. This video provides instructions on how to replace the source lamp.
Welcome to the replacing the source lab video. In this video you will learn how to replace the source lab on the dimension EXL with LM and dimension XXL 200 integrated chemistry systems, dimension RXL Max integrated chemistry system and the dimension expand and expand plus integrated chemistry systems. This procedure should be performed 5 minutes after performing a controlled power shutdown to allow the source lamp assembly to cool. To perform a controlled power shutdown, first confirm that the system is in standby. Select the sign out icon. The change operator window displays. Select shutdown. When the prompt if you really want to shut down the application, type Y displays. Select the Y key on the keyboard or yes on the touch screen. The console menu displays. Select option 4. Shut down. The shutdown menu displays. Select option two to shut down. When the message do you really want to shut down, the computer displays. Select option one OK. Push the instruments main power switch to the down position. Flip the reagent management system or RMS switch to the down position if using the dimension EXL with LM integrated chemistry system. Once the lamp has cooled, lower the cuvet thermal chamber by placing a screwdriver into the hole of the thermal chamber release bracket and pushing the screwdriver down on the internal release plate until the thermal chamber drops down completely. The source lamp is easily located by the Yellow Burn Hazard icon. To better see the procedure, this portion of the instruction will be performed on a demonstration photometer. Loosen the two captive screws that hold the source lamp assembly in place. Unplug the source lab connector PJ72B located inside the Cuvet Thermal chamber and remove the source lamp. Install the new source lamp by first plugging back in the source LAMP connector. Align the holes at the two corners of the source lamp assembly over the pins. And then tighten the thumbscrews. Next, raise the thermal chamber by placing both hands underneath and lifting until the thermal Chamber seats completely against the base plate. Do not raise the thermal chamber by lifting up the plastic components where the air hose connects to the thermal chamber. Check the yellow tape indicators to ensure the chamber is closed completely. Restore power by first turning on the Rams. If installed. And then the main power switch. At the console menu, press 1 dimension. Sign in with appropriate operator ID and password. Permission is needed to perform calibrations. Next, perform the photometer alignment from the operating menu by selecting F7 diagnostics. Select F3 alignments. Select F4 photometer. Perform an arm alignment and when the time in the high field is 30 minutes or greater, select F4 Mau offset calibration. After completing the alignments, perform a system check and daily QC. Refer to the dimension systems operators guide for detailed instructions and a list of methods that must be calibrated following this replacement procedure. If documenting using the paper logs from the dimension system operators guide, document the maintenance and the weekly slash monthly maintenance log sheet or instrument log sheet. Or, if documenting using the electronic logs in the dimension system software, document the maintenance in the instrument log screen.
115/230 3.0 33 333 1348 14 000 293 340 200 383 405 452 510 540 577 600 700 Replacing the Source Lamp on the Dimension® Family of Integrated Chemistry Systems Video SIEMENS . Standby Sampler Idle IMT OK 09/14/22 21:23 Dimension Exit Enter labmanager en OPERATING MENU STAT Status PLEASE SELECT AN OPTION USING THE FUNCTION KEYS: Sample Alert Supplies At any time, press HELP to get help, or press EXIT to exit a program. QC Alert Calib Alert To Shut down or Change Operator, press Sign Out or Alt+EXIT. Run Home F1: ENTER DATA F2: SAMPLE STATUS F3: TEST RESULTS F4: SYSTEM PREP F5: PROCESS CTRL F6: SYSTEM CONFIG F7: DIAGNOSTICS F8: SEGMENT STATUS Healthineers Change Operator Do you really want to Shutdown/ Change Operator? rogram. GuestUser Shutdown Cancel If you really want to shut down the application, type 'y'. YES NO 1. Dimension® 2. Update Software 3. More Options 4. Shutdown 1. Reboot Warning! Do you really want to shutdown the computer? 2. Cancel 24 3D 3.15A SMP LD OVRD OFF BRANCH SLOT VOLTAGE F1 1.6A CR2 REFRIGERATION CR3 HYDRATION COOL SOLENOID VACUUM PUMP COMPRESSOR F5 MAIN POWER F6 FAN All Fuses 250V / Type T UPS F20 F4 SIEMENS ED CONTROL 2 ED CO CE CLOSED NOT CLOSED Rev A PN 751735.001 LOSED F2 F3 RMS INTAK F7 IMT Not Calib 01/11/23 06:09 STA Sign In Sar Operator ID Password Ca F3: 10/25/22 14:07 DIAGNOSTIC MENU Press EXIT to exit a program. F1: ELECTRO/MECH F2: FILM LOAD F3: ALIGNMENTS F5: CHECK WINDOWS F6: ERROR LOG F7: KINETICS F8: OPEN CHANNELS Diagnostics ALIGNMENT MENU SELECT PROGRAM USING FUNCTION KEYS F1: REAGENT F2: SAMPLER F4: PHOTOMETER F5: CUVETTE F6: HM MODULE F7: F8: ALIGN FILE PHOTOMETER ALIGNMENT AND CALIBRATION nm mAU offset dark calibration: reference: 0.00 Hz sample (outer on): sample (outer off): lamp: HIGH time on HIGH > 30.0 min low calib level: high calib level: F1: DARK CALIB F2: LAMP CALIB F3: ARM ALIGN F4: mAU OFFSET CAL F5: PHOTOMETER OFF F6: F8: 0.0 % If the photometer fails to initialize, perf Calibration procedure on the next page step 7. Check to see that there is no slack in the film coming o ting menu, press: n Prep ounts .oad 12 Document this replacement on the Instrument Log she Thermal Chamber to ensure complete closure. 7 Restore power as indicated in the Controlled Power Shi CAUTION! he Film cartridge. If there is, display the Film Loading/Tension F2: Tension. 9 Perform the entire Photometer Alignment procedure (s 10 Perform a System Check and your Daily QC. 11 Recalibrate the following methods: C3, C4, CCRP, CR IGA, IGG, IGM, LIDO, MALB, NAPA, PALB, PHNC THEO, TOBR, TRNF, VALP, VANC. Their performar source lamp. MAINTENANCE LOGS Year: 20XX Clean R3 Operator Disclaimer Please note that the learning material is for training purposes only. For the proper use of the software or hardware, please always use the Operator Manual or Instructions for Use (hereinafter collectively "Operator Manual") issued by Siemens Healthineers. This material is to be used as training material only and shall by no means substitute the Operator Manual. Any material used in this training will not be updated on a regular basis and does not necessarily reflect the latest version of the software and hardware available at the time of the training. The Operator Manual shall be used as your main reference, in particular for relevant safety information like warnings and cautions. Please note: Some functions shown in this material are optional and might not be part of your system. Certain products, product related claims or functionalities (hereinafter collectively "Functionality") may not (yet) be commercially available in your country. Due to regulatory requirements, the future availability of said Functionalities in any specific country is not guaranteed. Please contact your local Siemens Healthineers sales representative for the most current information. The reproduction, transmission or distribution of this training or its contents is not permitted without express written authority. Offenders will be liable for damages. All names and data of patients, parameters and configuration dependent designations are fictional and examples only. All rights, including rights created by patent grant or registration of a utility model or design, are reserved. C Siemens Healthcare GmbH 2023
- 10456305
- Dimension
- dimension
- family
- maintenance
- source lamp