Siemens Healthineers Academy
myExam Cockpit | Change Order

myExam Cockpit | Change Order

This video gives you an overview on how to change the order of regions, exams, or programms in myExam Cockpit.
Target group: Basic users.
Duration: 0:30 min | No audio included.

thorax SIEMENS shoulder Healthineers abdomen thorax pelvis female wrist 04:23 1 pd_tse_fs_cor bilat I•spine Import Simulate pelvis female Please note that the learning material is for training purposes only. 0452 hip shoulder For the proper use of the software or hardware, please always use the Operator Manual or Instructions for Use (hereinafter collectively elbow "Operator Manual") issued by Siemens Healthineers. This material is to be used as training material only and shall by no means substitute shoulder the Operator Manual. Any material used in this training will not be updated on a regular basis and does not necessarily reflect the latest wrist elbow version of the software and hardware available at the time of the training. t' _ bilat hand wrist tl cor bilat t2_tse The Operator Manual shall be used as your main reference, in particular for relevant safety information like warnings and cautions. Change Order hip hand Select the measurement SIEMENS knee Hip Assist hip step or protocoll Please note: Some functions shown in this material are optional and might not be part of your system. clinical libraries ankle library general 20 bnilateral tse fs tra bilat 04:48 Certain products, product related claims or functionalities (hereinafter collectively "Functionality") may not (yet) be commercially available t2_tse_stir cor bilat stir cor bilat clinical libraries in your country. Due to regulatory requirements, the future availability of said Functionalities in any specific country is not guaranteed. Then drag and drop Healthineers clinical libraries Please contact your local Siemens Healthineers sales representative for the most current information. arthrography foot into the tree view ankle gener al general The reproduction, transmission or distribution of this training or its contents is not permitted without express written authority. Offenders foot arthrography will be liable for damages. knee library ankle All names and data of patients, parameters and configuration dependent designations are fictional and examples only. myExam Cockpit knee All rights, including rights created by patent grant or registration of a utility model or design, are reserved. ankle foot Change the order of regions, @ Siemens Healthcare GmbH 2021 exams and programs

  • freemax
  • free max
  • change order
  • myexam cockpit
  • magnetom free
  • free.max
  • myExam Cockpit
  • Cockpit
  • myExam
  • myExam Companion
  • protocol tree
  • program order
  • region order
  • exam order