Siemens Healthineers Academy

Dimension Family of Integrated Chemistry Systems Maintenance Assessment

This assessment includes objectives covered in the Maintenance topic.

Continue Continue Continue Continue Continue Continue Continue Continue Continue Continue Continue Continue Continue Continue Continue Continue Continue Untitled Scene Dimension® Family of Integrated Chemistry Systems Maintenance Assessment Welcome No audio Disclaimer Please note that the learning material is for training purposes only. For the proper use of the software or hardware, please always use the Operator Manual or Instructions for Use (hereinafter collectively “Operator Manual”) issued by Siemens Healthineers. This material is to be used as training material only and shall by no means substitute the Operator Manual. Any material used in this training will not be updated on a regular basis and does not necessarily reflect the latest version of the software and hardware available at the time of the training. The Operator Manual shall be used as your main reference, in particular for relevant safety information like warnings and cautions. Please note: Some functions shown in this material are optional and might not be part of your system. Certain products, product related claims or functionalities (hereinafter collectively “Functionality”) may not (yet) be commercially available in your country. Due to regulatory requirements, the future availability of said Functionalities in any specific country is not guaranteed. Please contact your local Siemens Healthineers sales representative for the most current information. The reproduction, transmission or distribution of this training or its contents is not permitted without express written authority. Offenders will be liable for damages. All names and data of patients, parameters and configuration dependent designations are fictional and examples only. All rights, including rights created by patent grant or registration of a utility model or design, are reserved. Unrestricted | Published by Siemens Healthineers AG | © Siemens Healthineers AG, 2024 Siemens Healthineers HQ | Siemens Healthineers AG Siemensstr. 3 91301 Forchheim Germany Phone: +49 9191 18-0 siemens-healthineers.com ? Disclaimer Assessment Start ? This assessment will test your retention of the presented content. A passing score of 80% or higher is required to complete the course and earn your certificate . Assessment questions must be answered completely to receive full credit. Partial credit will not be given for assessment questions that require multiple answers. You may repeat the assessment as many times as needed. Assessment Select the best answer. Replacing the R2 reagent probe tip Cleaning the IMT system Question 1 of 12 Which task is a cycle based maintenance procedure? Styletting HM wash probes Replacing the LOCI® vacuum cup ? Multiple Choice Select the best answer. Calibrate all test methods Run a system check Question 2 of 12 After replacing the photometer source lamp, which of the following tasks does not need to be performed? Calibrate test methods that may be affected by a new source lamp Photometer arm alignment and mAU offset calibration ? Multiple Choice ? Select two (2) answers. Question 3 of 12 Which of the following should be done after replacing the LOCI® Vacuum Cup? Realign the LOCI® arm Run QC on LOCI® methods Perform a calibration Replace the HM wheel Multiple Answer One or more answers are incorrect. ? Select two (2) answers. Question 4 of 12 Which of the following are weekly maintenance tasks? Cleaning the HM wash probes Cleaning the R2 reagent probe Replacing the sample probe Replacing the R2 reagent probe Multiple Answer One or more answers are incorrect. Select the best answer. ? Dispense 1 mL of water into the clot check drain 10 times Close the analyzer lids and select Pause to restart the sampling system Question 5 of 12 When cleaning the clot check drain on the IMT port, what is the next step after dispensing 1 mL of undiluted bleach into the clot check drain 10 times ? Select F8: Start Soak Wipe the clot check drain with clean gauze Multiple Choice ? Select two (2) answers. Question 6 of 12 Which of the following tools should be used to remove a cuvette window? Needle nose pliers Cuvette window extractor tool Screw driver 9/64 Allen wrench Multiple Answer One or more answers are incorrect. ? Select four (4) answers. Question 7 of 12 R2 Reagent Arm to Cartridge R2 Reagent Arm to Cartridge R2 Reagent Arm to Cartridge Which of the following are alignments for the R2 reagent probe? R2 Reagent Arm to Drain R2 Reagent Arm to Target (Cuvette) R2 Reagent Arm to Incubate Wheel R2 Reagent Arm to Reagent Tray Multiple Answer One or more answers are incorrect. Select the best answer. ? Monthly Yearly Question 8 of 12 How often is the X tubing on the IMT peristaltic pump replaced? Weekly Daily Multiple Choice Select the best answer. ? Vacuum System IMT System Question 9 of 12 Which system needs to be turned off before cleaning the reagent probe drains? Reagent Management System HM System Multiple Choice Clean the sample probe Undiluted bleach and sample cup Clean the sample drain 10 percent bleach solution and drain brush Clean the HM wash probes Cotton swab dipped in water Clean the R2 reagent probe Cotton swab dipped in 0.1 normal sodium hydroxide Drag each response from the right column to its corresponding item in the left column. Match the correct tools needed to complete each maintenance task below. ? Question 10 of 12 Matching One or more answers are incorrect. Select the best answer. ? Monthly Yearly Question 11 of 12 How often is the IMT system tubing and port cleaned? Weekly Daily Multiple Choice Select the best answer. ? QuikLYTE® Integrated Multisensor IMT pump Question 12 of 12 What needs to be replaced after bleaching the IMT system? Cuvette film cartridge IMT tubing Multiple Choice Assessment Results YOUR SCORE: PASSING SCORE: Review Retry Retry Continue Continue Continue %Results.ScorePercent%% %Results.PassPercent%% ? Assessment Results You did not pass the course. Take time to review the assessment then select Retry to continue. Congratulations. You passed the course.. Exit To access your Certificate of Completion, select the Certificates tab from the learning activity overview page. You can also access the certificate from your PEPconnect transcript. ? You have completed the Dimension® Family of Integrated Chemistry Systems Maintenance Assessment. Completion details, certificates tab Navigation Help Select the icon above to open the table of contents. Click Next to continue. Next Welcome Slide The timeline displays the slide progression. Slide the orange bar backwards to rewind the timeline. Click Next to continue. Next Tmeline Select the CC icon to display closed captioning (subtitles). Click Next to continue. Next Caption Icon Select the buttons to learn more about a topic. Be sure to review all topics before navigating to the next slide. Click Next to continue. Next Tab Arrow Slide Select the X to close the pop-up. Click Next to continue. Next Layer Slide Some images may have a magnifier icon. Select the image to see an enlarged view. Select it again to return to the normal view. Click Next to continue. Next Zoom Slide Some images have a magnifier icon in the bottom-left corner. Select these image to see an enlarged view of the image. Select the image again to return to the normal view. Videos should default to the optimal resolution. However, to change the video resolution select the gear icon. Click Next to continue. Next Video Slide Some images have a magnifier icon in the bottom-left corner. Select these image to see an enlarged view of the image. Select the image again to return to the normal view. Select Submit to record your response. Click the X in the upper right corner to exit the navigation help. Assessment Slide Question Bank 1 QR700008039 | Effective Date: 24 Apr 2024 1.1 Welcome 1.2 Disclaimer 1.3 Assessment

  • Dimension
  • maintenance
  • assessment